When do I need a Grading Permit?
A Grading Permit is required in the City of Frisco if you would like to do any of the following activities:
• Land Clearing
• Lot Grading
When do I need a Right of Way (ROW) Permit?
A ROW Permit is required in the City of Frisco if you would like to do any of the following activities:
• Trenching
• Street, alley, or driveway cut and/or bore
• Drilling
• Pulling cable
• Installation of permanent and/or temporary aerial poles
• Installation of street lights
• Geotechnical exploration testing (such as subsurface bores)
• Facility maintenance that requires digging
• Irrigation installation
A ROW Permit Application can be obtained from the Public Works Department located at 11300 Research Road, 972-292-5800.